Disclaimer: The following material is being kept online for archival purposes.
Although accurate at the time of publication, it is no longer being updated. The page may contain broken links or outdated information, and parts may not function in current web browsers.
Operations Strategy for GGS/SOLARMAX
5.1 Need to Preserve Existing Measurements
5.2 Reconfiguration and Optimization of ISTP Assets
5.3 Relation of GGS/SOLARMAX to Other Solar-Terrestrial Missions during Solar Maximum
Re-engineering the Ground System
3.1 Science Planning and Operations Facility
3.2 Flight Operations Team
3.3 Deep Space Network (DSN)/Data Capture
3.4 Flight Dynamics
3.5 Data Operations
3.5 Data Availability