POLAR PI TELECONFERENCE: FRIDAY, Sep 20 at 4 p.m. Eastern
POLAR PI TELECONFERENCE: FRIDAY, Sep 20 at 3 p.m. Central
POLAR PI TELECONFERENCE: FRIDAY, Sep 20 at 2 p.m. Mountain
POLAR PI TELECONFERENCE: FRIDAY, Sep 20 at 1 p.m. Pacific
5 min: Misc. updates and announcements
- Several folks on travel this week, those sitting in please feel free to
speak up
- Funding expectations for FY03
- Yosemite Meeting, January 27-31, 2003 or thereabouts
- Senior Review to be announced, planning meeting to be held at Fall AGU
10 min: Operations Update
- eclipse operations, including plans for next year
- spring flip
- Leonids
- A fall operations schedule is available
5 min: Polar magnetometer data access
- MFE processing status
- Spin period averages of the MFE magnetic field in GSM coordinates have been made available at an
anonymous ftp site. Some cautions have been identified.
10 min: Polar, Wind and Geotail data processing changes
Instrument teams should have now completed the following:
Testing of the NRT interface
Verification email to project scientist that the NRT will suit your needs
Testing of the PWG ftp site and verification of availability of data types
Verification email to project scientist that the data distribution system will suit your needs
Started testing that KP files produced on the new system are correct
By the end of this week, instrument teams should have:
Switched their routine NRT operations over to the new system
Switched their routine data access operations over to the new system
Not due until October 1 is:
Verification email sent to project scientist that KP production suits your needs.
Teams have not been able to complete the following:
Receive or test a level zero CD produced by the new system.
- What verification emails do we have?
- Be sure to check the CD distribution
- Summary document available in .html and .pdf formats
5 min: Plans for the next Polar Science Team Meeting
30 min: Science Presentation: The Case for Component Reconnection
The presentation is also available as a Powerpoint file at: The Case for Component Reconnection
NEXT TELECON:
- October 25?
- EFI and CAMMICE science
Send additions/corrections to barbara.giles@gsfc.nasa.gov